Dating davis ca

The public review and comment period closes September 22, 2017, and comments are due no later than PM on September 22, 2017.

Frank Gehrke, chief of the California Cooperative Snow Surveys Program, will begin the survey at 11 a.m.The flood control spillway flows remain at 0 cubic feet per second (cfs).Inflows are approximately 14,000 to 20,000 cfs which has resulted in the lake rising from 860.9 feet to 861.4 feet elevation in the last 24 hours.just off Highway 50 near Sierra-at-Tahoe Road, about 90 miles east of Sacramento.The survey will determine the water content of the snow at Phillips.

Leave a Reply